Home/Trades/Steel & Structural
Trade · Steel & Structural · CSI Division 05

Structural Steel, Measured to Tonnage.

Columns, beams, connections, and miscellaneous metals — quantified from your structural set and reconciled against connection details, not just member schedules.

Book a Free Demo →See Shop Drawings
🏗️

Primary Framing

Columns, beams, girders — sized, counted, and totaled to tonnage by member type and grade.

🔩

Connections

Base plates, moment connections, bracing — quantified with the hardware that goes with them, not assumed.

⚙️

Miscellaneous Metals

Stairs, railings, ladders, embeds, and other misc-metal scope that regularly gets missed in a fast takeoff.

Where Steel Bids Go Wrong

Tonnage Isn't The Whole Story.

A steel estimate built purely off a member schedule undercounts connection material and labor almost every time — moment connections, stiffener plates, and field bolts add real weight and real cost that a schedule-only takeoff misses. We cross-reference structural drawings against connection details and general notes, not just the beam schedule, to catch this before it becomes a change order.

Need shop-ready detailing after the takeoff, or cold-formed steel connections on the light-gauge side of the job? Those run through our Shop Drawings and CFS Detailing services — coordinated with the same team.

🛡️

Engineer-checked, not just AI-counted

Structural steel connection complexity is exactly why our quality assurance process routes steel scope to a specialist reviewer — someone who's read structural drawings before, not a generalist skimming a member list.

Get Your Steel Package Quantified Right.

Send your structural set — we'll scope tonnage, connections, and misc metals together.

Related: Concrete · Heavy Civil & Sitework
See it live in 20 minutes.Book a Demo →