Ductwork, equipment, and controls quantified from mechanical drawings and schedules — structured the way mechanical estimators actually price a job.
A usable HVAC takeoff covers linear footage of ductwork by size and gauge, fittings and transitions, insulation, equipment counts pulled from schedules (RTUs, AHUs, VAV boxes, diffusers), piping for hydronic systems, and controls scope. We separate supply, return, and exhaust so pricing can be applied at the right rate for each — not lumped into one generic "ductwork" line that hides where the cost actually is.
Equipment schedules and floor plan callouts frequently disagree — a unit shown on the schedule but relocated (or missing) on a later plan revision. Fitting counts are also commonly underestimated when a takeoff is done quickly from a single-line duct diagram instead of the full plan set. Our review step exists specifically to catch schedule-vs-plan mismatches like these before they reach your bid.
Whether you're a mechanical subcontractor bidding your scope directly, or a design-build GC needing a mechanical number to complete a full-package bid, the same takeoff structure applies — reviewed by an estimator with mechanical experience, not a generalist. See how the review step fits the overall pipeline on Quality Assurance.
24–48 hour standard turnaround. Every quantity engineer-checked.